Tenth Line Lot 29/30 Roadway and Slope Repair – Town of Halton Hills

Project Overview

Reconstruction of 370m of Tenth Line and 110m of the adjacent slope, located at Lot 29/30 between 27 Side Road and 32 Side Road. This includes theinstallation of a terramesh wall system to support the roadway and secure the section of slope that is failing. Works involve granular removal, clearing and grubbing, excavation, culvert removal and installation, cable guide rail removal, steam beam guide rail installation, multiple new ditch applications, installation of the terramesh wall system (including a drainage layer, geogrids, mesh wall system).

Owner

Town of Halton Hills

Consultant / Engineer 

Halton Hills Engineering Department

Project Photos