SOIL CHARACTERIZATION
Greenspace works with Qualified Professionals (QPs) to conduct records of site conditions, site assessments, and sampling plans to ensure source sites and receiver sites meet O. Reg 406/19 Requirements.
O. REG 406/19 CONSULTING
Greenspace helps contractors work through any concerns with the new regulation O. Reg 406/19.
SOURCE SITE MANAGEMENT
Greenspace ensures that all sources of excess soil are pre-approved, before allowing access to fill management sites. The soil must come from a reputable source and meet the site-specific standards. This is to be proven by reviewing/vetting soil characterization reports.
ABOUT OUR SERVICES
Greenspace Environmental is an innovative excess material management consultant, focusing on excess soil in the construction industry.
Our core objective is to ensure that excess soil is finally placed in the most economical, regulatory compliant and environmentally sustainable way.
TRUCK TRACKING / RECORDS
Greenspace organizes hauling from source site to reuse site including truck procurement, tracking/recording system, and on-site supervision of loads-in and loads-out.
SITE SUPERVISION
Greenspace manages loads on site to ensure imported soil is finally placed in the designated area. Also, to ensure the soil visually meets specifications provided.
HEAVY EQUIPMENT OPERATOR
Greenspace manages loads on site to Greenspace can provide heavy machinery to move, compact, screen or load excess soil during site operations
Some of our Projects
Load, Haul and Disposal of Soil
City of Markham
Load, Remove, Transport and Dispose Excess Soil
City of Vaughan
Disposal of Stockpiled Soil
TRCA Offsite