Supply and Delivery of Topsoil Ashbridges Bay Treatment Plant Landform Project
Toronto and Region Conservation Authority
N/A
$2M
April 2024 - December 2024
The project involves the supply and delivery of approximately 115,000 m³ of topsoil, including full soil testing and analytical reporting in accordance with O. Reg. 406/19. Prior to delivery, all topsoil is tested to ensure it meets applicable quality and reuse standards. Where feasible, suitable topsoil is identified and reused on-site to reduce waste and hauling requirements. The scope also includes the loading, transportation, and placement of material, with comprehensive haul route planning and real-time tracking of all material movements to ensure regulatory compliance and operational efficiency. Detailed documentation and reporting are maintained throughout the process to support traceability, environmental compliance, and quality assurance.