

Metrolinx Don Valley Crossing
Leaside Valley Builders (LVB)
A joint venture between EBC and Demathieu-Bard Construction
GHD
$2.5M
September 2024 - Ongoing
As part of the $600 million Metrolinx expansion project led by a joint venture between EBC and Demathieu Bard Construction, Greenspace Environmental provided key environmental services for the construction of a bridge spanning the Don Valley and crossing over the Don Valley Parkway. Working directly for the general contractor, Greenspace was responsible for soil testing and reporting in compliance with O. Reg. 406/19, on-site soil delineation, coordination with excavation crews, and full logistics management of soil removal. This included real-time tracking of trucking operations and directing soils to either a Class 1 soil remediation facility or an approved re-use site, ensuring regulatory compliance, operational efficiency, and environmental stewardship throughout the project