Replacement Old Lexington Road (Culvert And Watermain Replacement)

City of Waterloo

GEI (Formerly GM Blueplan)

$2.2M

June 2022 - December 2022

Environmental protection according to GRCA, Site setup including safety protocols and site office, Clearing and grubbing, deep excavation and removal of existing culvert system including contaminated soil, existing utility protection and temporary support, waterproof shoring system and bypass system design and installation, helical pile installation, supply and installation of a new precast concrete culvert, place rebar, form and pour concrete footings and wingwalls CIP including structural steel, installation of a new watermain, stream bed remediation with native substrate installation of roundstone in the watercourse, site remediation including planting, topsoil and seed.