Corbett Creek Waterfront Trail Improvements
Town of Whitby
Aquafor Beech
$4.1M
September 2024 - July 2025
The work includes construction of a site entrance road with excavation, environmental controls, and granular placement, as well as pathway excavation and off-site disposal of excess material in accordance with O.Reg 406. Scope also includes excavation, shoring, and concrete forming for bridge and boardwalk abutments, along with the final design, supply, and crane-assisted installation of the longest pedestrian truss bridge in Ontario, as well as associated boardwalk structures. Infrastructure installation will involve helical piles, and the project will conclude with site remediation, including topsoil placement, terraseeding, and a comprehensive planting package.